Heart O' Gold Shelties Rescue
Home
Our Dogs
Puppies
Facilities
Philosophies
Stories and Poems
Friends and Pets
Sheltie Tether Ball
The Grapevine
Seasonal
Rescue
Sheltie Links
Awards
Contact Us
Site Map
Step 4

Install door guides - Cut ¾" stock, as follows: two pieces at B" long and two pieces at B+3" long. Pre-drill three 1/8" pilot holes in each piece of ¾" x ¾" stock, one hole approximately 2" from each end and the third hole at the center. Install as shown below:

Step 4

Step 5

Cut out drop door from either ½" or 5/8" plywood, as shown below:

Step 5

Step 6

Trip Pedal - Measure the bottom of the crate. Using ¼" thick plywood (or similar paneling or Luan), cut the trip pedal as follows:

Step 6

Note - Dimension 'E' is the side to side inside bottom measurement of the crate. Dimension 'F' is the front to back inside bottom measurement of the crate.