| June
14, 2003: Grading, footings |
|
|
| June
30, 2003: foundation, waterproofing |
|
|
| August
1, 2003: foundation, termite shield |
|
|
| August
15, 2003: subfloor and engineered lumber |
|
|
| August
27, 2003: Framing |
|
|
| September
17, 2003: Roofing, HVAC, Electrical |
|
|
| October
6, 2003: grading, drywall, windows |
|
|
| October
21, 2003: deck, floor, tile, painting |
|
|
| November
4, 2003: exterior paint, trellis, FSC doors |
|
|
| November
22, 2003: interior paint, lighting |
|
|
| December
5, 2003: carpets, kitchen, and walkways |
|
|
| January
12, 2004: driveway, appliances, and the best part of the
house. |
|
|
Questions?
Email the owner.
*
* * * * * * * * *
June
14, 2003: Weeks 2 and 3
 |
 |
| Picture
1: Topsoil Preservation and Pouring the Footings |
Picture
2: Footings and Good Drainage Design |
back
to top
June
30, 2003: Weeks 4 and 5
 |
 |
 |
| Picture
1: Up close and personal with the foundation waterproofing
system |
Picture
2: Radon detection system
|
Picture
3: Insulation for the basement
|
 |
 |
 |
| Picture
4: Footings for the main floor |
Picture
5: Inside the future basement
|
Picture
6: Another view of the waterproofing treatment |
back
to top
August 1, 2003
 |
 |
 |
| Picture
1: Footprint of the whole house from the east |
Picture
2: The new foundation facing east. This is the future
front porch. |
Picture
3: Termite shield and sealing |
 |
|
|
| Picture
4: Termite shield and sealing |
|
|
back
to top
August 15, 2003
 |
|
|
| Picture
1: The subfloor is finally on! |
Picture
2: A cross-sectional of the floor system |
Picture
3: Another cross-sectional of the floor system |
 |
|
|
| Picture
4: The future home of my kayaks |
Picture
5: The future home
of my kayaks. |
Picture 6: The framing around the crawl space |
back
to top
August
27, 2003
 |
 |
 |
| Picture
1: View of framing from the front yard |
Picture
2: A view of the house from the south. |
Picture
3: The walls went up quickly. Another front view. |
 |
 |
 |
| Picture
4: During the framing and inside the house |
Picture
5: During the framing and inside the house, part 2. |
Picture
6: A framing style recommended by Southface. |
 |
 |
 |
| Picture
7: Close view of the flooring system. |
Picture
8: Steps down to the basement |
Picture 9: Grading and filling in the porch. |
back
to top
September
17, 2003: Roofing, HVAC, Electrical
 |
 |
 |
| Picture
1: View from the front yard |
Picture
2: A view from the backyard |
Picture
3: From the south side of the house |
 |
 |
 |
| Picture
4: A future retaining wall |
Picture
5: What we'll make the retaining wall from |
Picture
6: In the living room |
 |
 |
|
| Picture
7: Another view of the living room |
Picture
8: Some great salvaged recessed lights |
Picture 9: Our 90% efficient heater |
 |
 |
 |
| Picture
10: HVAC strategy |
Picture
11: More HVAC strategy |
Picture 12: The engineered lumber is an electrician's
dream |