This page provides thumbnail prints of all of the pictures of the construction of the home. Each date is followed by a link that will take you to the main page of pictures for that period.

June 14, 2003: Grading, footings    
June 30, 2003: foundation, waterproofing    
August 1, 2003: foundation, termite shield    
August 15, 2003: subfloor and engineered lumber    
August 27, 2003: Framing    
September 17, 2003: Roofing, HVAC, Electrical    
October 6, 2003: grading, drywall, windows    
October 21, 2003: deck, floor, tile, painting    
November 4, 2003: exterior paint, trellis, FSC doors    
November 22, 2003: interior paint, lighting    
December 5, 2003: carpets, kitchen, and walkways    
January 12, 2004: driveway, appliances, and the best part of the house.    

Questions? Email the owner.

* * * * * * * * * *

June 14, 2003: Weeks 2 and 3

Picture 1: Topsoil Preservation and Pouring the Footings Picture 2: Footings and Good Drainage Design

back to top

June 30, 2003: Weeks 4 and 5

Picture 1: Up close and personal with the foundation waterproofing system Picture 2: Radon detection system

Picture 3: Insulation for the basement
Picture 4: Footings for the main floor Picture 5: Inside the future basement

Picture 6: Another view of the waterproofing treatment

back to top

 


August 1, 2003

Picture 1: Footprint of the whole house from the east Picture 2: The new foundation facing east. This is the future front porch. Picture 3: Termite shield and sealing
   
Picture 4: Termite shield and sealing    

back to top

 


August 15, 2003

Picture 1: The subfloor is finally on! Picture 2: A cross-sectional of the floor system Picture 3: Another cross-sectional of the floor system
Picture 4: The future home of my kayaks Picture 5: The future home
of my kayaks.
Picture 6: The framing around the crawl space

back to top

August 27, 2003

Picture 1: View of framing from the front yard Picture 2: A view of the house from the south. Picture 3: The walls went up quickly. Another front view.
Picture 4: During the framing and inside the house Picture 5: During the framing and inside the house, part 2. Picture 6: A framing style recommended by Southface.
Picture 7: Close view of the flooring system. Picture 8: Steps down to the basement Picture 9: Grading and filling in the porch.

back to top

 


September 17, 2003: Roofing, HVAC, Electrical

Picture 1: View from the front yard Picture 2: A view from the backyard Picture 3: From the south side of the house
Picture 4: A future retaining wall Picture 5: What we'll make the retaining wall from Picture 6: In the living room
Picture 7: Another view of the living room Picture 8: Some great salvaged recessed lights Picture 9: Our 90% efficient heater
Picture 10: HVAC strategy Picture 11: More HVAC strategy Picture 12: The engineered lumber is an electrician's dream

back to top